Latest posts

October 21, 2019

InterMoor completes mooring change-out on Alba …


InterMoor Limited have recently completed the change-out of 12 mooring lines …

September 10, 2019

China Projects Update


InterMoor is currently working for COOEC on two major permanent mooring …

August 28, 2019

InterMoor completes Huntington OPT Buoy installation …


InterMoor Limited has completed the installation of OPT’s PB3 PowerBuoy® in …

April 22, 2019

The SEPLA’s Tale


Back in the 90s, offshore moorings began to regularly be conducted …

April 9, 2019

CALM Buoy Mooring – what we …


InterMoor has designed and decommissioned multiple mooring systems for CALM buoys. …

March 21, 2019

FEASIBILITY STUDY FOR SPREAD MOORED FPSO


Client: Jadestone Energy (Vietnam Nam Du) Pte. Ltd Location: Block 46/07 …

January 8, 2019

Three themes to watch out for …


The mooring world is changing fast and moving past the simple …

August 23, 2018

H-Link Mooring Connectors: A More Reliable …


The InterMoor Deepwater H-Link is composed of plates and pins that …

H-Link
June 20, 2018

Australia Inshore Cyclone Moorings: Rental, Design …


InterMoor operates 9 cyclone moorings in the Port of Dampier, off …

InterMoor inshore cyclone moorings in Dampier
May 30, 2018

InterMoor Wraps up Pre-lay Mooring in …


InterMoor recently completed the design, supply, and installation of a mooring …

Pre-lay mooring being installed