We have extensive experience in anchor design and offshore foundation design for moorings (including mooring over pipelines) and subsea equipment applications.

Year Client Project Application
2018 BP Mad Dog 2 Design and fabrication of four manifold piles: 20′ OD x 65′ long
2016 Subsea 7 Shell Stones ALM pile: 32’ x 55’
2015 Anadarko Heidelberg Suction piles for flow line and riser holdback: 12′–9″ x 65′ long
2012 Shell Shell Phase 2-5 manifold foundation conductors: 48″ x 200′ long
2012 Petrobras Papa Terra 17 well conductors: 36″ x 187′ long
2012 FMC Technologies Mad Dog 2 Manifold foundation
2012 EMAS Tamar Project Foundation piles: 18’ x 43’ long; 18’ x 72’ long
2012 Williams Gulfstar One Project (Tubular Bells) Mooring suction piles: 16’ x 88’ long

Case studies

Papa Terra Conductor Installation

Read case study

Delta House FPS

Read case study

Driven Pile Installation for BP Trinidad in Juniper Field

Read case study

Videos

Suction Piles – How they are made
InterMoor completes Turnkey Papa Terra conductor project