Americas/Asia
Year | Client | Project | Country | Water depth |
---|---|---|---|---|
2019 | Eni | Valaris 8505 | Mexico | |
2017 | OGPar | Atlantic Zephir | Brazil | |
2017 | Talos | Ensco 8503 | Mexico | |
2016 | bpTT | Ocean Victory | Trinidad | |
2016 | Anadarko | Black Hornet | Gulf of Mexico | |
2015 | Atwood Oceanics | Atwood Eagle | Australia | |
2015 | PetroSaudi | Saturn | Venezuela | |
2015 | ExxonMobil | Endeavor | Romania | |
2014 | Ensco | Ensco 5005 | Myanmar | |
2014 | ExxonMobil | Ocean Apex | Vietnam | |
2014 | Daewoo | Doo Sung | Malaysia | |
2014 | Saipem | Scarabeo 7 | Indonesia | |
2014 | Diamond Offshore | Oceanquest at DH-10P (Vietnam) installation | 365′ | |
2014 | PetroSaudi | Saturn at DR-8 and 9 installation | 400′ | |
2013 | PetroSaudi | Saturn at DR-11 Installation | 400′ | |
2013 | PetroSaudi | Saturn at DR-5A installation | 400′ | |
2013 | Signal | Maersk Developer at VK-248 | 220′ | |
2013 | Walter Oil and Gas | Ocean Saratoga at MC-583 | 2,500′ | |
2012 | Shell | Noble Clyde Boudreaux | 6,651′ – conventional mooring record | |
2012 | CGX Resources | Ocean Saratoga (Guyana) | 300′ |
West Africa
Year | Client | Project | Water depth |
---|---|---|---|
2015 | Hess | West Esperenza | 1,744′ |
2013 | Hess | Foxtrot/Echo TLP mooring replacement | 899′ |
2013 | Cabgoc | Transocean R135 At ABO-4 | 1,909′ |
2012 | Addax | GSF Rig 135 (Nigeria) | 250′ |
2011-2012 | Hess | Ocean Valiant (Equatorial Guinea) | 2,640’+ |
2009-2012 | ExxonMobil | Transocean Rather (Angola) | 4,455′ |
2011-2012 | ExxonMobil | Gsf Celtic Sea (Angola) | 4,190′ |
2011-2012 | Maersk | Ensco 5001 (Angola) | 4,059′ |
UK
Year | Client | Project | Water depth |
---|---|---|---|
2019 | Enquest | Northern Producer | |
2019 | Spirit Energy | Paragon B391 | |
2018 | Apache | Ocean Patriot | |
2017 | Repsol Sinopec | Buchan Alpha | |
2017 | Stena | Stena Spey | |
2016 | Apache | Ocean Patriot | |
2016 | Stena | Stena Spey | |
2015 | Suncor/Premier | Ensco 100 | |
2015 | Nexen/Chevron | Blackford Dolphin | |
2015 | Hess | Wilhunter | |
2015 | AGR | Diamond Drilling Ocean Guardian Semi-Submersible (700 Series) | 150–450m |
2011-2012 | ADTI | Sedco 704 | |
2011 | Apache | Rowan Gorilla VII | |
2010-2012 | Centrica | Noble Julie Robertson | |
2008-2012 | Diamond Offshore | Ocean Nomad |
Year | Client | Project | Water depth | Application |
---|---|---|---|---|
2019 | Chevron | Alba | 138m | Mooring lines change-out |
2019 | ExxonMobil | Serpentina | 475m | Mooring system installation |
2018 | Total E&P | Ailsa FPSO | Tow and hook-up | |
2018 | MISC | Benchamas 2 FSO | Tow and hook-up | |
2016 | Shell | Malikai TLP | Float-off marine operations | |
2016 | Shell | Stones | 9,500′ | |
2015 | Anadarko | Heidelberg | 5,300′ | |
2014 | LLOG | Delta House FPS | 4,500′ | |
2013 | Tioman/KPOC | KBB Platform/Skd Alliance Tad hook-up (Malaysia) | 700′ | |
2012 | COOEC | Lufeng NHSK FSOU | 132m | Relocation and hook-up |
2012 | Saipem | Firenze | 815m | Installation and hook-up support |
2010 | ATP | Mirage | 4,000′ | Mooring design, installation, tow, upending and hook-up |
2008 | Cabinda Gulf Oil Company | Tombua South Drill Centre | 870′ | Provided the design, engineering, procurement, and installation for the permanent pre-set catenary moorings at the Tombua South Drill Centre (Angola) |
2008 | Cabinda Gulf Oil Company | Tombua Landana | 1,250′ | Provided the design, engineering, procurement, and installation for the permanent pre-set taut-leg moorings at the Tombua Landana location (Angola) |
2008 | Oilexco | Shelley FPSO | 140′ | Mooring installation, tow and hook-up |
2008 | Petrofac | Northern Producer | 110′ | Mooring installation, tensioning and hook-up |
Year | Client | Project | Application |
---|---|---|---|
2017 | Shell | Vito | Design twelve (12) identical mooring piles: 18 ft. Ø x 83 ft. long |
2015 | BpTT | Juniper | Driven piles |
2014 | LLOG | Delta House | 12 mooring suction piles: 16′ x 85′ long estimated |
2012 | Williams | Gulfstar One Project (Tubular Bells) | Mooring suction piles: 16′ x 88′ long estimated |
2008 | ATP | Mirage | Mooring driven piles: 84” x 205′ long; 84” x 225′ long |
2007 | Technip | Shell Perdido | Mooring suction piles: 18′ x 87′ long; 18′ x 103′ long; 18′ x 90′ long |
2006 | Murphy Oil | Kikeh | Modu suction anchors: 14.75′ x 52.5′ long |
2006 | Technip | Kikeh | Mooring driven piles: 84” x 153′ long; 84” x 163′ long; 84” x 173′ long; 84” x 182′ long |
Case studies

AGR Petroleum Services Multi-Client Marine Services Project
Read case study
Pre-set mooring installation on HYSY 111 FPSO in Panyu oilfield
Read case study
ATP Mirage MinDOC Mooring
Read case study
STONES TURRITELLA FPSO Pre-Commissioning
Read case study
Benchamas FSO Replacement
Read case study
Delta House FPS
Read case study