We are the only mooring service company worldwide that offers full services for both temporary moorings and permanent moorings.

Americas/Asia

Year Client Project Country Water depth
2017 OGPar Atlantic Zephir Brazil
2017 Talos Ensco 8503 Mexico
2016 bpTT Ocean Victory Trinidad
2016 Anadarko Black Hornet Gulf of Mexico
2015 Atwood Oceanics Atwood Eagle Australia
2015 PetroSaudi Saturn Venezuela
2015 ExxonMobil Endeavor Romania
2014 Ensco Ensco 5005 Myanmar
2014 ExxonMobil Ocean Apex Vietnam
2014 Daewoo Doo Sung Malaysia
2014 Saipem Scarabeo 7 Indonesia
2014 Diamond Offshore Oceanquest at DH-10P (Vietnam) installation 365′
2014 PetroSaudi Saturn at DR-8 and 9 installation 400′
2013 PetroSaudi Saturn at DR-11 Installation 400′
2013 PetroSaudi Saturn at DR-5A installation 400′
2013 Signal Maersk Developer at VK-248 220′
2013 Walter Oil and Gas Ocean Saratoga at MC-583 2,500′
2012 Shell Noble Clyde Boudreaux 6,651′ – conventional mooring record
2012 CGX Resources Ocean Saratoga (Guyana) 300′

 

West Africa

Year Client Project Water depth
2015 Hess West Esperenza 1,744′
2013 Hess Foxtrot/Echo TLP mooring replacement 899′
2013 Cabgoc Transocean R135 At ABO-4 1,909′
2012 Addax GSF Rig 135 (Nigeria) 250′
2011-2012 Hess Ocean Valiant (Equatorial Guinea) 2,640’+
2009-2012 ExxonMobil Transocean Rather (Angola) 4,455′
2011-2012 ExxonMobil Gsf Celtic Sea (Angola) 4,190′
2011-2012 Maersk Ensco 5001 (Angola) 4,059′

 

UK

Year Client Project Water depth
2018 Apache Ocean Patriot
2017 Repsol Sinopec Buchan Alpha
2017 Stena Stena Spey
2016 Apache Ocean Patriot
2016 Stena Stena Spey
2015 Suncor/Premier Ensco 100
2015 Nexen/Chevron Blackford Dolphin
2015 Hess Wilhunter
2015 AGR Diamond Drilling Ocean Guardian Semi-Submersible (700 Series) 150–450m
2011-2012 ADTI Sedco 704
2011 Apache Rowan Gorilla VII
2010-2012 Centrica Noble Julie Robertson
2008-2012 Diamond Offshore Ocean Nomad
Year Client Project Water depth Application
2018 Total E&P Ailsa FPSO Tow and hook-up
2018 MISC Benchamas 2 FSO Tow and hook-up
2016 Shell Malikai TLP Float-off marine operations
2016 Shell Stones 9,500′
2015 Anadarko Heidelberg 5,300′
2014 LLOG Delta House FPS 4,500′
2013 Tioman/KPOC KBB Platform/Skd Alliance Tad hook-up (Malaysia) 700′
2012 COOEC Lufeng NHSK FSOU 132m Relocation and hook-up
2012 Saipem Firenze 815m Installation and hook-up support
2010 ATP Mirage 4,000′ Mooring design, installation, tow, upending and hook-up
2008 Cabinda Gulf Oil Company Tombua South Drill Centre 870′ Provided the design, engineering, procurement, and installation for the permanent pre-set catenary moorings at the Tombua South Drill Centre (Angola)
2008 Cabinda Gulf Oil Company Tombua Landana 1,250′ Provided the design, engineering, procurement, and installation for the permanent pre-set taut-leg moorings at the Tombua Landana location (Angola)
2008 Oilexco Shelley FPSO 140′ Mooring installation, tow and hook-up
2008 Petrofac Northern Producer 110′ Mooring installation, tensioning and hook-up
Year Client Project Application
2015 BpTT Juniper Driven piles
2014 LLOG Delta House 12 mooring suction piles: 16′ x 85′ long estimated
2012 Williams Gulfstar One Project (Tubular Bells) Mooring suction piles: 16′ x 88′ long estimated
2008 ATP Mirage Mooring driven piles: 84” x 205′ long; 84” x 225′ long
2007 Technip Shell Perdido Mooring suction piles: 18′ x 87′ long; 18′ x 103′ long; 18′ x 90′ long
2006 Murphy Oil Kikeh Modu suction anchors: 14.75′ x 52.5′ long
2006 Technip Kikeh Mooring driven piles: 84” x 153′ long; 84” x 163′ long; 84” x 173′ long; 84” x 182′ long

Case studies

AGR Petroleum Services Multi-Client Marine Services Project

Read case study

Pre-set mooring installation on HYSY 111 FPSO in Panyu oilfield

Read case study

ATP Mirage MinDOC Mooring

Read case study

STONES TURRITELLA FPSO Pre-Commissioning

Read case study

Benchamas FSO Replacement

Read case study

Delta House FPS

Read case study