Technical Articles

Integrity Index and Integrity-based Optimal Design of Structural Systems
2.13.2014

InterMoor contributed to a paper published in Engineering Structures Vol 60 on "Integrity Index and Integrity-based Optimal Design of Structural Systems" Mousavi a,, Gardoni b. a Texas A&M University, b University of Illinois at Urbana-Champaign

Security and Peace of Mind on the Ocean Floor - Considerations for Pipeline Initiation Foundations
10.14.2013

Successful subsea pipeline installation require precise control at the initiation point of the pipeline during the installation.

Practical Approach to MIM - Emerging FPSO Forum 9-24-13
9.25.2013

This presentation outlines a practical approach to Mooring Integrity Management (MIM) for FPUs already in operation and touches on the potential for comprehensive MIM programs for new systems of the future.

InterMoor's installation of a permanent mooring and riser system on NHSK FSOU in the Lufeng Oilfield - Oilfield Technology Article Jan 2013
5.14.2013

In 2012, InterMoor completed the installation of a permanent mooring and riser system for the NanHai Sheng Kai floating storage and offloading unit (NHSK FSOU) in the Lufeng oilfield, South China Sea.

First Permanent Polyester Prelay on the Seabed in Gulf of Mexico - 2013 Topsides Presentation
2.21.2013

First Permanent Polyester Prelay on the Seabed in Gulf of Mexico

Deepwater Conductor Driving Method Enhances Well Integrity
12.31.2012

Three batches of conductors have successfully been installed by InterMoor offshore Brazil.

MOSS 2012 - After action review for a permanent platform wire replacement
9.6.2012

InterMoor successfully replaced (8) spiral-strand platform wires on a permanent production facility in May 2011.

Get in Contact